Posted on August 03, 2023
For Above Php 50,000.00 to Php 500,000.00
Date: May 10, 2023
Procurement Title: Supply, Delivery, Testing and Commissioning of One (1) Complete Set of
Hydraulic Power Pack and Hydraulic Breaker (Brand New)
Approved Budget for the Contract (ABC): Php 750,000.00
Name of Company : ___________________
Address : ___________________
___________________
________________________________________________________________________________
Please quote your lowest price on the item listed below, subject to the general conditions stating the shortest time delivery and submit your quotation duly signed by your representative not later than May 17, 2023. Time 10:00 AM.
GENERAL CONDITIONS:
1 |
ALL ENTRIES MUST BE TYPEWRITTEN EXCEPT SIGNATURE |
2 |
BUSINESS PERMIT/MAYOR’S PERMIT, TAX CLEARANCE/ANNUAL INCOME TAX RETURN, PROOF OF PHILGEPS REGISTRATION AND DTI/SEC SHALL BE ATTACHED UPON SUBMISSION OF THE QUOTATION. |
3 |
BIDDERS SHALL SUBMIT ORIGINAL BROCHURES SHOWING CERTIFICATIONS OF THE PRODUCT BEING OFFERED. IF AAPLICABLE. |
4 |
QUOTATION MUST BE DENOMINATED IN PHILIPPINE PESO, INCLUSIVE OF ALL TAXES AND LEVIES. QUOTATIONS EXCEEDING THE APPROVED BUDGET FOR THE CONTRACT (ABC) SHALL AUTOMATICALLY BE REJECTED |
5 |
SUBMISSION WILL BE TREATED AS “OPEN QUOTATION” AND MAY ALTERNATIVELY BE TRANSMITTED THRU FAX OR E-MAIL. |
6 |
MARIWAD RESERVES THE RIGHT TO POST QUALIFY ANY SUPPLIER AND/OR REJECT ANY/OR ALL SUBMITTED QUOTATIONS. |
7 |
AWARD OF CONTRACT SHALL BE MADE ON THE LOWEST QUOTATION (FOR GOODS & INFRA) OR HIGHEST RATED OFFER (FOR CONSULTING SERVICES) WHICH COMPLIES WITH THE MINIMUM SPECIFICATIONS AND OTHER TERMS AND CONDITIONS STATED HEREIN. |
8 |
LIQUIDATED DAMAGES (L.D.) EQUIVALENT TO ONE TENTH OF ONE PERCENT OF THE VALUE OF UNDELIVERED AND/OR RENDERED PORTIONS OF THE CONTRACT/P.O. OUTSIDE THE PRESCRIBED DELIVERY PERIOD SHALL BE IMPOSED FOR EVERYDAY OF DELAY. OWNER SHALL RESCIND THE CONTRACT/P.O. IF THE CUMMULATIVE AMOUNT OF L.D. EXCEEDS 10% THE VALUE OF THE CONTRACT/P.O. w/o PREJUDICE TO OTHER COURSES OF ACTION AND REMEDIES OPEN TO IT, SUCH AS BUT NOT LIMITED TO UNIFORM GUIDELINES FOR SUSPENSION & BLACKLISTING OF SUPPLIERS/CONTRACTORS/CONSULTANTS. |
9 |
SUBMISSION OF SWORN STATEMENT ATTESTING NO RELATIONSHIP TO ANY MEMBER OF THE BAC COMMITTEE |
Item No. |
ITEM AND DESCRIPTION |
QTY |
UNIT |
UNIT COST |
TOTAL COST |
|
Supply, Delivery, testing and Commissioning of One (1) Complete Set (Brand new) Hydraulic Power Pack and hydraulic Breaker with the Following Sepcifications: |
|
|
|
|
1 |
Hydraulic Power Pack (Brand New) With the following technical data: Motor/engine : 13 Hp Weight including oil : 91 kg Dimensions (LxWxH) : 745mm x 600mm x 705mm Oil Flow : 20 – 30 L/min Maximum Pressure : 150 bar Fuel Capacity : 6.5 Liters Cooling system : Efficient thermostatically controlled oil Cooler Equipped with power on demand, on/off valve, Filter indicator, Wheels and foldable handles |
1 |
unit |
|
|
2 |
Handheld Hydraulic Breaker (Brand New) With the following technical data: Tool shank : 32 x 160mm Weight : 26.5 kgs Length : 765mm Oil flow : 20 – 30 L/min Working pressure : 110 – 125 bar Max back pressure : 15 bar Sound power guaranteed : 110 Lw, db (A) Impact rate (30 L/min) : 1350 – 1750 blows/min |
1 |
unit |
|
|
3 |
Moil Point Shank size : 32 x 160mm Working Length : 380mm |
1 |
pc |
|
|
|
|
TOTAL COST |
|
NOTE: PLEASE INDICATE BRAND OF THE ITEM/S.
Delivery Period(Calendar days): ______________
WARRANTY: _______________
PRICE VALIDITY: _______________
After having carefully read and accepted your General Conditions, I/We quote you on the item at prices noted above.
___________________________
SIGNATURE OVER PRINTED NAME
Date : ___________
Contact # :________________________
E-mail Add: ________________________
For further information, please contact the BAC at our office located at P. Road, San Isidro, Mariveles, Bataan.
ENG’R JOSEPH B. DELOS REYES
BAC Chairman
Noted by;
CRISTINELA RUTH I. LAMAYRA
General Manager
Date of PhilGEPS posting: May 10, 2023